Aviyan Hydropower enters into a detailed Topographical Survey contract agreement

Aviyan Hydropower Private Limited has entered into a contractual agreement with M/s. F.I.T. Engineering Survey Consultancy Private Limited effective 30th November, 2022 to carry out a detailed topographical survey for the “Lower Badigad Hydropwer Project” rated at 18.73 MW. 

The “Lower Badigad Hydropwer Project” is a Run-of-River project envisioned upon the bank of Badigad river located between Baglung and Gulmi Districts.

Scroll to Top